End to End Project Solutions
Construction of Water Pump Room/Enclosure.
On-Going Installation of Doors and Windows and Wall Finishing.
Renovation of TAO Office at 2nd Floor
– Installation of Ceiling
– Wall Painting Works
– Tiles Laying
Removal of old and not working air conditioning units
Replacement of existing old split type air-conditioning unit
Relocation of existing AC outdoor units
Supply and install new AC units including multi-split Daikin VRV-IV S
Printing Unit
CSA WORKS
• Unloading and Uncrating of 2 PU @ Pasig WH
• Reconditioning of Printing Unit
• Repainting of Printing Works
• Loading and transport of PU from Pasig WH to ASC Plant
…
PME Technic Green Building is our very own renovation project that will aim to convert a current 4 story building structure into 7 floors multipurpose facility.
Project Radiate: X35 and X3720 x-ray machine
Scope of Works Uncrating and hauling of X35 and X3720 x-ray machine. Positioning and alignment of X35 and X3720 x-ray machines to the proposed locatio. Modification of existing conveyor for X3720 x-ray machine
Project Outpack Enclosure
Scope of Works: Erection of new wall enclosure for cheese outpack – sandwich panel wall Installation of two units of AHU(Trane) with fabric ducts.
Project Outpack Enclosure
Scope of Works: Erection of new wall enclosure for cheese outpack – sandwich panel wall Installation of two units of AHU(Trane) with fabric ducts.