End to End Project Solutions
Construction of Water Pump Room/Enclosure.
On-Going Installation of Doors and Windows and Wall Finishing.
Renovation of TAO Office at 2nd Floor
– Installation of Ceiling
– Wall Painting Works
– Tiles Laying
SUCAT FIRE PROTECTION SYSTEM UPGRADE
In the past years, MPI had improved the fire protection system as part of the corrective actions from GRC visits with priorities in the Warehouse and Manufacturing Area.
Removal of old and not working air conditioning units
Replacement of existing old split type air-conditioning unit
Relocation of existing AC outdoor units
Supply and install new AC units including multi-split Daikin VRV-IV S
Technical conceptualization of project
Contractor Supervision
Project Management
PME Technic Green Building is our very own renovation project that will aim to convert a current 4 story building structure into 7 floors multipurpose facility.
Project Outpack Enclosure
Scope of Works: Erection of new wall enclosure for cheese outpack – sandwich panel wall Installation of two units of AHU(Trane) with fabric ducts.
Local Works Preparation
Preparation of Site for the installation of CIP system: construction of CIP kitchen room along with its utilities. Including the conversion of the old steam station to the new cornsyrup dosing area and construction of contractor temfacil area for Project CIP.
Project Radiate: X35 and X3720 x-ray machine
Scope of Works Uncrating and hauling of X35 and X3720 x-ray machine. Positioning and alignment of X35 and X3720 x-ray machines to the proposed locatio. Modification of existing conveyor for X3720 x-ray machine
Printing Unit
CSA WORKS
• Unloading and Uncrating of 2 PU @ Pasig WH
• Reconditioning of Printing Unit
• Repainting of Printing Works
• Loading and transport of PU from Pasig WH to ASC Plant
…