- Pre-Installation works conceptualization, planning, design and Execution.
Local Works Preparation
Preparation of Site for the installation of CIP system: construction of CIP kitchen room along with its utilities. Including the conversion of the old steam station to the new cornsyrup dosing area and construction of contractor temfacil area for Project CIP.
DESCRIPTION
GALLERY
OTHER MEDIA FILES
DESCRIPTION
CSA Works
- Foundation Works for:
- CIP Tank
- CIP Skid
- Construction of CIP Kitchen room
- Wall erection
- Wall demolition and restoration for equipment entry
- Equipment hauling
- Bund Wall construction
- PU flooring
- Installation of CIP platform
- Provision of Spill pallet
- Temporary enclosure of CIP Kitchen
- installation of Plastic curtain
- provision of emergency Eye and Full body wash
- Installation of New Drain line from CIP kitchen to Waste water treatment plant.
- extension of diverter platform for S6, S4 and SUP CIP circuit
Conversion of Old Steam Station to New Cornsyrup dosing area
- Re-routing of Cooker Steam supply
- Dismantling of Steam station equipment and Auxiliaries
- Retrofitting of Old steam station room to new Cornsyrup dosing area
- Opening of Steam station wall
- Renovation of ceiling
- Painting works
- PU flooring
- Dismantling and Relocation of Cornsyrup dosing equipment to new location.
Mechanical Works
- Supply and Installation of new compressed air line for CIP
- Supply and Installation of Steam and Condensate line for CIP Kitchen
- Supply and Installation of new water supply for CIP kitchen
- Installation of new exhaust system for CIP kitchen
- Design and Fabrication of Acid Tank
Electrical Works
- Dismantling and relocation of existing outlets
- Relocation and Provision of new lighting fixture for CIP kitchen
- Provision of electrical supply from production hallway to CIP panel