Loading...
I am Loader!
  • PME Technic Bldg. 2508 Syquia St. Sta. Ana, Manila 1009
  • inquiry@pmetechnic.com
  • 24/7 Customer Support
Facebook Twitter Instagram Linkedin Viber Youtube
GET A QUOTE

PME Technic Inc.

 


End to End Project Solutions

  • Home
  • About Us
  • Services
    • GREEN BUILDING &
      RENEWABLE ENERGY SERVICES
    • MANUFACTURING / INDUSTRIAL PLANTS NEW,
      EXPANSION AND RETROFITTING SERVICES
    • NEW BUILD SERVICES
  • Projects
    • Ongoing Projects
    • Previous Projects
  • Deliverables
  • Clients
  • Contact Us
Menu
  • Home
  • About Us
  • Services
    • GREEN BUILDING &
      RENEWABLE ENERGY SERVICES
    • MANUFACTURING / INDUSTRIAL PLANTS NEW,
      EXPANSION AND RETROFITTING SERVICES
    • NEW BUILD SERVICES
  • Projects
    • Ongoing Projects
    • Previous Projects
  • Deliverables
  • Clients
  • Contact Us

Mondelez International

  • Home
  • Projects
  • Mondelez international
image1
imagem1 (1)
Previous
Next

Mondelez International

Project suppress aims to improve the safety protection of the Mondelez Biomass Boiler Silo. This improvement will help prevent and eliminate the potential risk of having a dust explosion inside their rice husk silo.

Below are the items which the project aims to eliminate:

  • Fall from Height hazard due to unsafe monkey ladder
  • Dust explosion hazard due to possible rising of heat at the pneumatic feeding duct
  • Dust explosion hazard due to confinement of the silo
  • Overfeed of rice hull in the silo

Under project suppress below are the items installed to control or prevent/reduce the above hazards.

  • Silo monkey ladder platform
  • Cooling system of pneumatic ducting
  • Goose neck vent
  • Rice hull level sensor
  • Pneumatic slice valve

Mondelez International

Project LoF: Utilities Relocation aims to relocate the existing chillers to give way for the construction of new warehouse.

Below are the activities executed for the project.

  • Construction of new utilities area
  • Construction of new electrical room for the utilities area
  • Construction of new pipe rack
  • Relocation of existing VAM Chiller and CGAM Chiller
  • Provision of new electrical supply lines for the new utilities area

Mondelez International

Project vacuus aims to increase it’s sustainability initiative by installing new sets of vacuum machine. This will help the reduction of water consumption does helping the plant save water. This will help to drive increase in savings in terms of monthly water consumption. Part of this project also is the installation of solar collector for the CGAM Chiller. This solar collector will help to reduce the electrical consumption of the CGAM Chiller. The solar collector will pre-heat the refrigerant thus reducing the power needed by the compressor to run at full load. This will generate also savings in terms of energy savings.

Below are the installed on under the items installed.

  • Installation of 2 sets of new vacuum machine
  • Installation of new solar collector

Mondelez International

Project radiate/strongarms aims to install an new sets of palletizing robots , conveying  system and x-ray machines. This will help to increase the efficiency of product output.



Screenshot_72
Screenshot_73
Previous
Next

LOCATION

  • PME Technic Bldg. 2508 Syquia St. Sta. Ana, Manila 1009

CONTACT US

  • (02) 254-3019/ 254-1548
  • (02) 562-2498

FOLLOW US

  • https://www.facebook.com/ adminpmetechnic/

Copyright 2021 PME Technic. All rights Reserved

Powered by: Philippines Web Designer

REQUEST A QUOTE

No Thanks!